Flow Control Signals

Alumni Hall Renovation, March 2014 - Knox College
A worker signals the delivery crew outside whenever the flow needs to stop or resume through the hoses used to pump concrete up to the third floor of Alumni Hall.

Bookmark the permalink.

Comments are closed