Spreading Gravel Prior to Construction

Alumni Hall Renovation 2013

To protect the brick sidewalk and new concrete driveway in the front of Alumni Hall from the heavy equipment that will be used during the renovation, thick plastic sheeting has been laid across the surfaces, followed by 20 truckloads of gravel. The gravel will be removed following completion of the work.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>