Facebook Twitter LinkedIn Flickr YouTube
Facebook Twitter LinkedIn Flickr YouTube
 
Skip to content
  • Home
  • View All Posts
  • Share Your Memories
  • About
  • Give

Tag Archives: Floor

Mesh Reinforces Floor Construction

  April 28, 2014 Present

Alumni Hall Renovation, March 2014 - Knox College
Workers make final check of reinforcing steel mesh, installed over steel panels, preparing to pour concrete floors in one of the wings.

Tagged   concrete, Floor, mesh, Steel

Structural Steel Installed

  April 23, 2014 Present

Alumni Hall Renovation, March 2014 - Knox College
Following removal of all the original wooden floors, steel girders are installed in the east and west wings to support steel panels that will be topped with poured concrete.

Tagged   construction, Floor, renovation, Steel

Series of Tubes

  April 15, 2014 Present

Alumni Hall Renovation, March 2014 - Knox College
Concrete for the floor is piped through an open window into the third floor of the west wing of Alumni Hall.

Tagged   cement, concrete, Floor, window

Work Flows Toward Completion

  March 28, 2014 Present

Alumni Hall Renovation, March 2014 - Knox CollegeAs concrete is pumped onto the third floor of Alumni Hall, workers move the delivery hose over the steel mesh, while other workers smooth the floor.

Tagged   cement, concrete, Floor

Wrestling With Serpent

  March 25, 2014 Present

Alumni Hall Renovation, March 2014 - Knox College
Not quite Leighton’s “Athlete Wrestling With a Python,” but it’s close: Workers use steel hooks and skid plates to maneuver the concrete delivery hose while spreading the floor in the west wing of Alumni Hall.

Tagged   cement, concrete, Floor

Flow Control Signals

  March 22, 2014 Present

Alumni Hall Renovation, March 2014 - Knox College
A worker signals the delivery crew outside whenever the flow needs to stop or resume through the hoses used to pump concrete up to the third floor of Alumni Hall.

Tagged   cement, concrete, Floor
  • Categories

    • Future
    • Past
    • Present
    • Uncategorized
  • Archives

    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014
    • March 2014
    • February 2014
    • January 2014
    • December 2013
    • November 2013
    • October 2013
    • September 2013
  • Tags

    Adelphi Alumni Hall Art auditorium Basement Benjamin Harrison ceiling cement Center Hall classroom concrete construction contest cornerstone demolition design Door driveway drywall exterior Facebook Floor Front steps Gnothautii grafitti Homecoming interior Library masonry Offices and Services Plays professor rendering renovation Snow Stage Steel Theater theatre The Gizmo The Hearth tour Twitter Video Winter
Powered by Paяabola & WordPress.