Author Archives: Peter Bailley

Installing New Campus Lights

The Knox College staff electrician replaces the globe after installing a new long-life, energy efficient LED bulb in a campus light.

Comments Off

Moving Bike Shop to New Quarters

A summer student worker helps move bicycles to the new location for the campus bike shop, in the basement of the Old Jail on the Knox campus.

Comments Off

Sidewalk Completed

The new sidewalk is completed on South West Street, built to increase safety for students walking in the area.

Comments Off

Campus Pathway Construction

Knox College Grounds staff prepare dirt for a new cross-campus gravel pathway south of Old Main.

Comments Off

Sidewalk Nears Completion

After raising a underground utility box, Facilities Services staff prepare to complete a new sidewalk on West Street.

Comments Off

Boxed In at Sidewalk

Facilities Services staff examine an underground utility box that had to be raised to level of the new sidewalk on West Street.

Comments Off

Presidential Visit Preparation

Facilities Services staff clean Memorial Gymnasium in preparation for visit to campus by President Barack Obama on July 24, 2013.

Comments Off

Moving AV Equipment

Knox College students move audio-visual equipment to a storage area in the Umbeck Science Mathematics Center.

Comments Off

Conquering the Mountain of AV Equipment

Knox College Audio Visual staff laid out a lot of their equipment in the Francois Classroom for an inventory, testing and general house-cleaning this summer.

Comments Off

Residence Hall Renovation

Facilities Services staff measures to install a door during renovation of a campus residence this summer.

Comments Off